ABOUT JBNU
-
http://ju.ac.kr/me2920
- 링크복사
Organization Chart
A. Description of Responsibilities / Key Achievements
Responsibilities
-
Facility Planning Team
- Budget planning for facility projects
- Construction project planning, design, architectural consultation
- Construction supervision and completion inspection
-
Facility Team 1
- Fire protection, disaster prevention, interior renovation, and exterior design
- Planning, designing, architectural consultation
- Space inspections and supervision for architectural projects
-
Facility Team 2
- Land development, landscaping, and roads
- Design, construction management, and completion inspections
- Transportation impact assessments
-
Mechanical Equipment Team 1
- Planning, design, installation, and supervision for mechanical systems such as HVAC, energy systems, and labs
- Safety management and other mechanical system tasks
-
Mechanical Equipment Team 2
- Planning, design, installation, and supervision for electrical and telecommunication systems
- Maintenance of electric, fire, and communication facilities
- Elevator management
Key Achievements
-
Expansion Projects
- Construction of Industry-Academia Cooperation PLAZA
- Remodeling and Extension of the College of Pharmacy
- Construction of Natural Sciences Building No. 3
- Construction of Joint Research Complex
- Renovation of Two Buildings including the College of Arts
- Expansion of the Semiconductor Joint Research Center
- Construction of Laboratory Animal Center
- Reconstruction of the Main Building of the Affiliated High School of the College of Education
- (Funded) Construction of Medical Device Validation Center for Innovative Regenerative Medicine using Mechanobiomaterials
- (Funded) Construction of Pharmaceutical Industry Future Talent Training Center
- (Global) Development of Namwon Campus
- (Policy) Installation of Facilities for the Disabled
- (Policy) Asbestos Removal Project
- (Policy) Construction of New Renewable Energy Facility
-
BTL Projects
- Construction of Student Dormitory
- Construction of Building No. 1, College of Agriculture and Life Sciences
- Construction of Sports Complex
- Construction of Dormitory Phase 5
- Construction of Building No. 1, College of Engineering
-
General Maintenance Projects
- Landscaping of Central Library 1st Floor Lounge
- Landscaping of JBNU International Center Lounge
- Installation of GHP (Gas Heat Pump) storage equipment
- Replacement of aging pressure tanks, communication cables, distribution panels, and transformers
- Replacement of aging chillers, windows, and elevator parts
- Environmental improvement of auxiliary field
- Replacement of deteriorated retaining walls at auxiliary Stadium
- Exterior landscaping from Main Building to Humanities Building
- Repair of walkway between the College of Arts Building No. 2 – North Gate
- Creation of Garden and Rest Area behind the Second Library
- Repair of Garden and walkway of the College of Engineering Building No. 6
- Remodeling of the 77th Anniversary Memorial Hall
- Improvement of the 3rd Floor Conference Room in Jinsu Hall
- Environmental improvement and fire curtain installation at Samsung Cultural Center
- Improvement of campus streetlights and lighting
- Painting of building exteriors, facility walls, and roof waterproofing of Hanok building
- Establishment of research and experimental laboratories for new faculty members
- Supplementing fire inspection checklist items
- Performance inspection and repair of mechanical equipment, desks, and wooden furniture
- Renovation of lecture halls, lockers, and sinks
- Maintenance of wooden decks and outdoor stairs on campus
- Maintenance of ceiling-type and central HVAC systems
- Replacement of deteriorated plumbing (outdoor valves, drainpipes, steam piping, etc.)
- Installation of signage manufacturing facility
- (Laboratory) Construction of Safety Infrastructure in Laboratories
- Construction of Upper-Level Underground Parking Lot
- Installation of Outdoor Display Board
- Renovation Work of the Buan Experimental Forest
- Installation of Biohazardous Waste Disposal System
- Work Environment Improvements (for Faculty and Students)
B. Organization Chart
-
Facilities Division
- Facility Planning Team
- Facility Team 1
- Facility Team 2
- Mechanical Equipment Team 1
- Mechanical Equipment Team 2
C. Location (Building)
- 2nd Floor, Main Administration Building, Jeonbuk National University
D. Contact Information
- Tel: 063-270-2088
- Email: pys@jbnu.ac.kr